Cold formed steel is a modern approach to meet demand Advanced CFS construction methods such as the FRAMECAD System can result in faster build times AND time is money.
By working out construction details prior to shovels going in the ground, buildings built of cold-formed steel can be up faster than wood or concrete. Cold-formed steel products also come with all of the accessories needed, such as bolts, and do not require time-consuming welding
Building complex with 3 Apartments(3 bedrooms each)
Time of completion: 45 days